WEST DRIVE, BRIGHTON

A couple who wanted to add two bedrooms and another bathroom to their house. Due to the very shallow roof, the only option was to remove existing one, raise the gable end walls and build a new roof structure with a slightly wider angle. Due to the conservation area and the type of the project, it took over a year and a few changes to drawings made by our architect, but in the end the plans were approved by local planning. It took 14 weeks to rebuild the roof and create two great size bedrooms, a bathroom and a hallway with a stunning gallery balcony and a good size skylight bringing so much daylight into the house.

CONTACT

COPYRIGHT 2018 ALL RIGHTS RESERVED

TERMS OF SERVICE

COOKIE POLICY

PRIVACY POLICY

CERTIFICATION

HANDY LINKS

FOLLOW US

CONTACT INFO

ABOUT US

FACEBOOK

6 ISLINGWORD ROAD, BRIGHTON,

BUILDING SERVICES

INSTAGRAM

EAST SUSSEX, BN2 9SE

PROJECTS

LINKEDIN

M: 07737202086

CONTACT

YOUTUBE

T: ‎01273 945600